Building the building

Ground got dug, pipes got laid and we got the date of the pouring of concrete.  Me, being Asian, again practiced what grandmas and grandpas used to do ~ DH & I laid some coins & padi grains under the plastic lining that was spread out. Yes, in the living room, 6″ inside of the front stakes’ marking and in the area marked for the kitchen. (Heck, it’s not everyday that I’ll be building a house of my design & my requirements, so I might as well practice idiosyncrasies & superstitious rituals of my ancestors.)

Ground pouring

The Front Door stakes

Brick by Brick

Brick by Brick

The Backdoor to/from the Kitchen

The Backdoor to/from the Kitchen

Kitchen, Dining area & Patio walls

OK, so now the roof is semi-on; not the metal sheets yet, but at least I won’t get rained on should I be “indoors” (doors still missing though).

Backdoor to the left; guest room ahead.

Filldirt with new wet concrete slab & a real back door.

Filldirt with new wet concrete slab & a real back door.

The roof is up so stairs got ... built up.

The roof is up so stairs got … built up.

The Front Door with a raw pit right outside, no, it's not a swimming pool.

The Front Door with a raw pit right outside, no, it’s not a swimming pool.

Trucks galore on a 1-lane road; my poor neighbours  :(

Trucks galore on a 1-lane road; my poor neighbors 😦

With all the building going on and trucks rolling in ~ my crucial notice did go up.

Oh, my precious Banana pups...

Oh, my precious Banana pups…